Energy Market

Energy Market

Energy Market

Filter

EV Charging Backbone for Every Parking Bay

$1,190

A building-wide EV charging backbone of cable or busway that brings power close to every parking bay, so any resident can add a charger later, with load management built in.

From $1,190 (Per parking bay), including GST. Indicative starting price: the final fixed price is confirmed in writing after a site assessment.

SKU: BES-EVC-06
Brand: Blue Energy Solar
Pack size: Per parking bay
Form: Design + installation
Categories: Strata & Apartments
Share it:

As more residents buy electric vehicles, apartment buildings face a choice: approve individual charger installations one at a time, with cables running in every direction, or plan once for the whole car park. An EV charging backbone is the planned approach. A cable or busway system runs through the car park with connection points near each bay, supplied from a dedicated board and controlled by load management, so any resident can add a charger later with a short, simple connection.

A backbone starts from $1,190 per parking bay. This is an indicative starting price; the final fixed price is confirmed in writing after a site assessment, supply study and proposal for the owners corporation.

What's included

  • A supply capacity study of the building's main switchboard and maximum demand
  • A car park survey of cable routes, fire separations and bay layout
  • Backbone design using cable or busway, with connection points for each bay
  • A dedicated EV distribution board and load management system
  • A staged delivery plan to suit the budget and resident uptake
  • A proposal, by-law considerations and a plain-English summary for the owners corporation
  • Installation by our licensed electricians, with testing and documentation

Why Blue Energy Solar

A backbone is shared infrastructure that should serve the building for decades, so we design it with future uptake in mind rather than today's handful of EVs. Load management allows many chargers to share the existing supply, which often avoids or delays an expensive supply upgrade. We give committees clear options, including staging the work by car park level, and we coordinate with the strata manager on access, fire safety requirements and notices to residents so the project runs smoothly.

Recommended for

Owners corporations planning fair, future-ready EV charging access for every resident in an apartment building.

Approval: a backbone on common property requires an owners corporation resolution. A by-law usually sets out how residents connect chargers and pay for their electricity.

Supply: the backbone uses the building's spare capacity. Load management shares it between chargers, which means charging may slow at peak times.

Batteries: NSW apartment building battery incentives from 1 September 2026 apply to eligible buildings with at least 4 units and shared batteries of 20-200 kWh usable capacity, which may be worth considering alongside EV charging.

Price drivers: the number of bays, car park layout, fire-rated penetrations, cable versus busway, switchboard works and staging.

Directions

1. The committee or strata manager requests an assessment and shares building plans.
2. We study supply capacity and survey the car park.
3. You receive a backbone design, staging options and a fixed-price proposal.
4. The owners corporation considers the proposal and passes the required resolution.
5. We install the backbone, distribution board and load management in agreed stages.
6. Residents can then request individual chargers that connect to the backbone.

Warnings

The price shown is an indicative starting price per bay; the final fixed price is confirmed in writing after a site assessment and proposal.
Works start only after the owners corporation passes the required resolution and provides written authorisation.
Supply upgrades, if needed, require network approval and are quoted separately.
Individual chargers are not included and are quoted per bay.
Fire safety requirements for penetrations and car park works must be met and may affect cost.

Frequently Asked Questions

Individual installations from each unit's meter can quickly use up switchboard space, create long cable runs through common property and overload the building's supply. A backbone gives every owner the same fair access, a tidy installation and load management from the start. It also turns approving each new charger into a simple, consistent process.

Often not straight away. Load management lets many chargers share the spare capacity already available, because cars park for long periods and do not all need full power at once. The supply capacity study shows how much capacity exists and at what point, if any, an upgrade might be needed as uptake grows.

Yes. A common approach is to start with the distribution board, load management and backbone on one or two levels, then extend it as demand grows. The design is completed for the whole car park first, so each stage connects cleanly. Staging spreads cost across budget periods without locking the building into a patchwork result.

Typically the owners corporation funds the shared backbone as common property, while each resident pays for the charger at their bay and for their charging electricity. Arrangements vary, and the by-law should set them out clearly. We provide cost breakdowns that help the committee and strata manager explain the options to owners.
Delivery Options

Service area & scheduling

Where we work

  • Sydney and a radius of roughly 200 km: Newcastle, the Central Coast, Wollongong, the Southern Highlands, the Blue Mountains, Bathurst, Orange, Lithgow, Goulburn and the Canberra region.

Timing

  • Usually 3-6 months from the committee's request to completion, depending on owners corporation approval, supply studies and staging.

How your request works

  • Send your request and our team contacts you to arrange the site assessment. You receive a written fixed-price quote before any work starts.
  • All electrical work is carried out by licensed electricians; solar and battery design and installation by SAA-accredited installers.
  • Blue Energy Solar is a New Energy Tech Approved Seller and holds $20 million public liability cover.

Prices include GST.

Review
Please login or register to submit a review.
JoseFernandez
Great product the results are fascinant
02/08/2024 02:59 PM

Energy Market

Call us directly
0421 458 217
Send an Enquiry