Energy Market

Energy Market

Energy Market

Filter

DC Fast Charger

$34,900

DC fast charging for commercial sites, fleets and retail car parks, including a supply capacity study, site design and installation, with any network upgrade identified early.

From $34,900 (Per charger, installed), including GST. Indicative starting price: the final fixed price is confirmed in writing after a site assessment.

SKU: BES-EVC-04
Brand: Blue Energy Solar
Pack size: Per charger, installed
Form: Design + supply + installation
Categories: Commercial
Share it:

DC fast chargers supply power directly to the vehicle's battery, bypassing the car's onboard charger, so they can add range far faster than AC chargers. They suit places where drivers stop for a short time, such as retail centres, cafes and service businesses, and depots where fleet vehicles must turn around quickly between shifts. For customer-facing sites, fast charging can also attract visitors who stay nearby while their car charges.

DC fast chargers start from $34,900 per charger, installed. This is an indicative starting price; the final fixed price is confirmed in writing after a supply capacity study, site design and proposal.

What's included

  • A supply capacity study using the site's maximum demand and interval data
  • Site layout for bays, cable routes, accessibility and vehicle protection
  • Charger selection matched to vehicle types, dwell times and budget
  • The network application and identification of any network upgrade needed
  • Civil works coordination, mounting and cabling
  • Installation and commissioning, with electrical work by our licensed electricians
  • Set-up of access control, payment or fleet management options and monitoring

Why Blue Energy Solar

The charger is often the simplest part of a DC project. The real cost and timing risk sits in the supply, because a single fast charger can draw as much power as a small commercial building. We study your supply before recommending hardware, so any network upgrade is identified at the proposal stage rather than halfway through construction. We also look at solar, batteries and load management that may reduce demand peaks and running costs, and we plan works around your trading hours so customers and staff are not disrupted.

Recommended for

Retail centres, service businesses, fleet depots and commercial sites where vehicles need quick charging stops.

Supply and network upgrades: some sites need more capacity for DC charging. Depending on the study, this may mean a larger connection, a new main switchboard or network works such as a substation upgrade, which require network approval and can add significant cost and time.

Running costs: high demand from fast charging can increase demand charges. Load management or battery support can help limit peaks.

Approvals: council approval, signage, accessibility requirements and landlord consent may apply.

Price drivers: charger power, number of outlets, supply works, trenching and civil works, and payment systems. We hold $20 million public liability cover.

Directions

1. Request a proposal and share site plans, interval data and your charging goals.
2. We complete a supply capacity study and site assessment.
3. You receive a design, the network requirements and a fixed-price proposal.
4. Once accepted, we lodge network and council applications as required.
5. We coordinate civil and electrical works and install the charger.
6. The charger is commissioned, access and payment systems are configured, and monitoring goes live.

Warnings

The price shown is an indicative starting price per charger; the final fixed price is confirmed in writing after a supply capacity study and proposal.
Network upgrades, if required, are subject to network approval and are quoted separately.
Council approval, landlord consent and accessibility requirements must be met before works start.
Civil works, trenching and resurfacing are scoped and priced in the proposal.
Payment platforms and ongoing software subscriptions carry their own separate terms.

Frequently Asked Questions

It depends on the charger's power and on the vehicle's maximum DC charging rate, battery size and state of charge. Charging is fastest when the battery is low and slows as it fills. A higher-power charger only helps if the vehicle can accept that power. We match charger power to the vehicles and dwell times at your site.

Not always. Some sites have enough spare capacity for a charger, especially with load management, while others need a larger supply or network works. The supply capacity study answers this before you commit. If an upgrade is needed, we explain the network process, likely timing and cost implications in the proposal.

Yes. Many DC chargers support payment by card or app, with pricing set by you. Payment and charger management platforms usually carry ongoing fees, so we explain the options alongside the hardware. Fleet sites can instead use access control and usage reporting to allocate charging costs internally.

They can help. Solar can offset some daytime charging energy, and a battery can supply part of each charging session to limit demand peaks on the grid connection. The value depends on how often the charger is used and on your tariff. We model these options with your data rather than adding them by default.
Delivery Options

Service area & scheduling

Where we work

  • Sydney and a radius of roughly 200 km: Newcastle, the Central Coast, Wollongong, the Southern Highlands, the Blue Mountains, Bathurst, Orange, Lithgow, Goulburn and the Canberra region.

Timing

  • Typically 3-6 months from accepted proposal to commissioning, depending on supply studies, civil works and any network upgrade.

How your request works

  • Send your request and our team contacts you to arrange the site assessment. You receive a written fixed-price quote before any work starts.
  • All electrical work is carried out by licensed electricians; solar and battery design and installation by SAA-accredited installers.
  • Blue Energy Solar is a New Energy Tech Approved Seller and holds $20 million public liability cover.

Prices include GST.

Review
Please login or register to submit a review.
JoseFernandez
Great product the results are fascinant
02/08/2024 02:59 PM

Energy Market

Call us directly
0421 458 217
Send an Enquiry